Registration is closed for this application.
Giovanni Rossi
Not specified
Giovanni Rossi holds a Ph.D. in Structural Dynamics from Politecnico di Torino (2015), is Italian-registered and LEED AP; he restores historic masonry, authored 10 journal articles read 200K+ times, and coaches Alpine cycling workshops.
- Private
- Bio
-
Education & Certifications: Giovanni holds a Ph.D. in Structural Dynamics from Politecnico di Torino (2015). He is a Registered Structural Engineer in Italy and a LEED Advanced Project Management Professional.
Professional Path: Since 2016, Giovanni has consulted on seismic-resistant designs for historic masonry structures, most notably the restoration of a 17th-century palazzo in Florence. As Principal at DynamicStructures Srl, he leads a team of six engineers on heritage projects.
Scholarly Contributions: He has authored ten journal articles, with his seminal work “Nonlinear Response of Masonry Domes” cited 140 times and read 200 000 times on ResearchGate.
Personal Pursuits: An avid cyclist, Giovanni completes cross-country rides in the Italian Alps and hosts weekend workshops on structural conservation for local volunteers.
- Website
- Profile Link
- Social