Registration is closed for this application.
Freya Eriksson
@NordicHVACFreya | Not specified
Freya Eriksson graduated in Mechanical Engineering from Chalmers (2012), Six Sigma Black Belt and ANSYS certified; at NordicClimate Tech she cut complex’s energy use 28% and publishes ASHRAE case studies while sailing competitively.
- Private
- Bio
-
Qualifications & Experience: Freya earned her B.Eng. in Mechanical Engineering from Chalmers University of Technology (2012) and completed a Six Sigma Black Belt program in 2018. She is also certified in ANSYS Structural Analysis.
Career Highlights: Beginning her career designing HVAC systems for Stockholm’s commercial towers, Freya rose to Senior Systems Engineer at NordicClimate Tech. She led the retrofit of a 30 000 m² shopping complex, reducing energy consumption by 28 percent within a year.
Technical Publications: She has published four case studies in ASHRAE journals, including her 2021 analysis of geothermal integration in high-rise buildings.
Outside Work: A passionate sailor on Lake Vänern, Freya captains her local regatta team and mentors engineering students at her alma mater.
- Website
- Profile Link
- Social