Registration is closed for this application.
Chen Zhang
@BIMCoderChen | Not specified
Chen Zhang graduated from Tsinghua University (2012) in Computer Science, is a Certified ScrumMaster and Revit user; as CTO at BuildAI, he built a helmet-detection system for 15 Shanghai sites and shares IEEE presentations.
- Private
- Bio
-
Background & Certifications: Chen graduated from Tsinghua University in 2012 with a B.Eng. in Computer Science; he is a Certified ScrumMaster and Autodesk Revit Certified User.
Tech-Driven Construction: As CTO at BuildAI Solutions, he architected the backend for a helmet-detection system deployed at 15 major Shanghai sites, processing real-time video to send instant safety alerts.
Published Insights: Three IEEE conference presentations on deep-learning site surveillance, viewed over 30,000 times on IEEE Xplore.
Unexpected Hobby: Writes open-source Revit plugins and competes in Beijing’s amateur chess circuit.
- Website
- Profile Link
- Social