Registration is closed for this application.
Aisha Khan
@AquaEngineerAisha | Not specified
Aisha Khan holds an M.Sc. in Environmental Engineering from Imperial College London (2014) and specializes in AI-driven wastewater process optimization; her award-winning sludge-reduction algorithm and 12 conference papers have reached 250K+ views.
- Private
- Bio
-
Education & Early Inspiration: Growing up in flood-prone Karachi sparked Aisha’s fascination with water management. After earning an M.Sc. in Environmental Engineering from Imperial College London in 2014, she returned home to drive practical improvements in wastewater treatment.
Professional Journey: At AquaSmart Technologies she built AI-driven process optimizers for large sewage plants. Her landmark project was a sludge-reduction algorithm at Karachi’s North Sewage Plant, which lowered processing costs by 22 percent and earned an industry innovation award.
Research & Recognition: Aisha has presented twelve papers at IEEE and WEFTEC conferences; her “Real-Time Monitoring of Water Quality via IoT Sensors” talk has amassed over 250,000 online views.
Personal Touch: When not debugging code or analyzing data, she paints urban landscapes—a London exhibit sold out—and mentors aspiring women engineers through Pakistan’s Women in STEM network.
- Website
- Profile Link
- Social