G
Guest

How to Use QArticles: Complete Guide to Writing and Publishing SEO-Optimized Articles

QArticles by Quollnet is a WYSIWYG article publishing tool that automatically generates SEO metadata, JSON-LD schema, Open Graph tags, and Twitter cards. Write content using a rich text editor, attach images and files, set hero images, and publish structured articles optimized for search engines and social media.

How To Use Qarticles Editor
How To Use Qarticles Editor
English version

QArticles: The Complete Publishing Guide

Introduction

QArticles is a WYSIWYG article editor and publishing platform designed for creating structured, SEO-optimized articles. It allows users to write content using a rich text editor while automatically generating metadata such as JSON-LD structured data, Open Graph tags, and Twitter cards.

The platform simplifies technical publishing by combining a powerful HTML editor with automated SEO features and a built-in attachment manager for images and documents. This guide explains how to create, edit, and publish articles using QArticles.


Creating a New Article

To create a new article, start by filling the article creation form. The form contains metadata fields that help search engines understand and display the article correctly.

new article button qarticles quollnet

Subject

The subject is the SEO title of the article.

  • Example: Excavator Technology Trends in 2026

Path (Slug)

The slug defines the article URL.

  • Examples: construction/equipment/excavators-2026 or excavators-2026

Meta Description

This description is used by search engines and social media previews.

  • Example: Explore the latest excavator technologies and market trends shaping construction equipment in 2026.

Meta Keywords

Keywords classify the topic of the article.

  • Example: excavators, construction equipment, heavy machinery

FAQ Section

FAQs must follow this specific format to allow QArticles to automatically convert them into structured FAQ schema:

q: What is an excavator? a: An excavator is a heavy construction machine used for digging and earthmoving.



Opening and Editing Articles

After creating an article, it can be edited at any time. To edit an article:

  1. Select the article from the left sidebar.

  2. Click the pencil icon.

  3. The editor will open, allowing you to modify the content.

[Image showing the sidebar and pencil icon]


Writing with the WYSIWYG Editor

QArticles uses a Google-Docs-style editor. Users can write normally and apply formatting using the toolbar. Available formatting includes:

  • Headings, Bold, and Italic

  • Lists and Alignment

  • Links and Indentation

  • Text size and font selection


Uploading Attachments

Attachments are managed using the attachment button located at the bottom right corner of the editor. When clicked, the attachment panel slides up from the bottom of the screen.

Supported File Types:

  • Images

  • PDF files

  • DOCX documents

  • XLSX spreadsheets

Upload Sources:

  • Camera or Gallery

  • File storage

  • Clipboard

    upload section quarticles quollnet



Inserting Images and Files

Once an attachment is uploaded, you can perform several actions via the tool overlay:

  • Insert image: Adds the image directly into the article using an <img> element.

  • Insert link: Adds the file as a clickable link.

  • Other actions: Copy link, Download, or Delete attachment.

    Hxyel5aPvy7LAAAAAElFTkSuQmCC


Setting the Hero Image

A hero image defines the main visual for the article. To set it:

  1. Upload an image.

  2. Select the image in the attachment panel.

  3. Click the "set as hero image" icon.

The hero image is automatically used for Open Graph previews, Twitter cards, and article thumbnails.


Editing HTML (Advanced Users)

For advanced users, QArticles allows viewing and editing the raw HTML. This is useful for:

  • Adjusting complex formatting.

  • Embedding custom elements.

  • Refining HTML structure manually.

The system still benefits from automatic metadata generation even when editing via HTML.


Publishing Articles

Articles move through multiple states:

  • Draft: The article is saved but not ready for public viewing.

  • Ready to Publish: For new users, the article enters this state awaiting approval.

  • Published: After approval, the article becomes publicly accessible.

Editing a Published Article

To modify an article that is already live:

  1. Unpublish the article.

  2. Edit the content.

  3. Publish the article again.


AI Translation

QArticles supports AI translation powered by GPT-5. The system uses version tracking to detect when translations become outdated compared to the original text.

  • Availability: AI translation is currently available on request.

  • Contact: contact@quollnet.com

 

Elie Saad's photo
Elie Saad
Mar 05, 2026
0
0
111
17

How To Use Qarticles Editor

Frequently Asked Questions


FAQ

Q: What is QArticles?

A: QArticles is a WYSIWYG article publishing platform that automatically generates SEO metadata, structured data, and social media tags while allowing users to write content using a rich text editor.

FAQ

Q: Does QArticles automatically generate SEO metadata?

A: Yes. The platform automatically generates JSON-LD schema, Open Graph metadata, and Twitter card metadata based on the article information provided.

FAQ

Q: How do I insert images in QArticles?

A: Images can be uploaded through the attachment panel and inserted directly into the article or linked using the attachment tools.

FAQ

Q: What types of files can be attached?

A: Users can attach images and files including PDF, DOCX, XLSX, and other documents.

FAQ

Q: Can I edit an article after publishing?

A: Yes. The article must first be unpublished, after which the content can be edited and published again.

FAQ

Q: Does QArticles support AI features?

A: Yes. AI translation powered by GPT-5 is available upon request by contacting contact@quollnet.com.

Related Checklists


Traffic Management & Pedestrian Safety Inspection
✅ 15 items
This checklist is designed to guide you through a thorough inspection of traffic management and pedestrian safety measures on site. It includes evaluating signage, barriers, pedestrian pathways, and vehicle access points to ensure compliance with safety standards and regulations. Proper inspection is crucial to prevent accidents and ensure the safety of both workers and pedestrians. This interactive checklist allows users to tick items, add comments, and export reports as PDF or Excel, complete with a QR code for authenticity.
Emergency Generator Fuel Supply & Ventilation Inspection Checklist
✅ 10 items
This checklist provides a comprehensive guide for inspecting the fuel supply and ventilation systems of emergency generators. Ensuring these systems are in optimal condition is crucial for reliable generator performance during power outages. This inspection includes checking fuel levels, examining fuel lines, and ensuring proper ventilation to prevent hazardous conditions. Users can interact with this checklist by ticking off completed items, adding comments, and generating reports in PDF or Excel format, complete with a QR code for verification.
Soil Compaction and Geotechnical Test Inspection Checklist
✅ 12 items
Inspecting soil compaction and geotechnical test results is a critical step before commencing foundation works. It involves assessing the soil's ability to support structures, ensuring that it meets the necessary compaction standards and geotechnical parameters. This checklist outlines the key tasks to verify soil conditions, including compaction tests, moisture content checks, and review of geotechnical reports. By following this guide, construction projects can mitigate risks such as foundation settling or failure, ensuring structural integrity. Utilize our interactive checklist to tick off completed tasks, add comments, and export the results as a PDF or Excel document, complete with a unique QR code for authenticity.
Generator & UPS System Installation Inspection Checklist
✅ 10 items
This checklist is designed to guide you through the comprehensive inspection of generator and UPS system installations. It covers key aspects such as site safety, equipment configuration, electrical connections, and performance testing. Ensuring these systems are installed correctly is crucial for reliable power backup, preventing costly downtime and protecting sensitive equipment. By using this interactive checklist, you can tick off tasks, add comments, and export your completed inspection as a PDF or Excel file, complete with a unique QR code for authenticity.
Raised Access Floor Inspection Checklist
✅ 10 items
A raised access floor inspection focuses on ensuring the levelness and stability of the floor system, critical for safety and performance in data centers, offices, and technical environments. This checklist includes evaluating the alignment, height, and mechanical stability of pedestals and tiles, while ensuring compliance with manufacturer specifications and safety standards. By conducting regular inspections, you can prevent costly repairs, maintain a safe environment, and ensure optimal performance. The interactive checklist allows you to tick off items, leave comments, and export your completed report as a PDF or Excel file, secured with a QR code for authenticity.

Related Articles


How Qarticles Works
⏳ 3 min read
How Qarticles Works: Wysiwyg Editor, Html Editing, Attachments And Seo Publishing
Learn how QArticles works: a WYSIWYG article editor with HTML editing, attachments, hero images, and automatic SEO metadata including JSON-LD, Open Graph, and Twitter cards.
Construction Defects
⏳ 5 min read
Major Construction Defects That Needs Immediate Attention
This article provides a comprehensive guide to common home maintenance issues, including poorly built foundations, cracked concrete, leaking pipes, faulty wiring, unstable roofs, defective windows, and improperly installed doors. It offers valuable information on identifying these problems, understanding their potential consequences, and taking necessary steps to address them. Whether you're a homeowner looking to maintain the value of your property or a DIY enthusiast seeking practical advice, this article is an essential resource.
Customize Your Company Qr Code
⏳ 1 min read
Is It Important To Customize Your Qr Code And How To Do It?
his article discusses the importance of including a company logo in a QR code for better recognition, branding, and aesthetics. It showcases samples created by Quollnet's QR code designer and provides a step-by-step guide on customizing and generating a QR code using Quollnet's QR code generator. The guide includes uploading a logo, selecting colors and shapes, and generating the final code.
Timely Notices In Construction
⏳ 5 min read
The Crucial Role Of Timely Notices In Construction Projects: An Engineer's Guide
An engineer's guide to understanding the importance of timely notices in construction projects, including best practices and the consequences of non-compliance.
Managing Variation Orders Construction Projects
⏳ 6 min read
Comprehensive Guide To Managing Variation Orders In Construction Projects
Learn effective strategies for managing variation orders in construction projects. Access free, no-registration-required templates to streamline your change order processes and maintain project efficiency.